PULLOVER WITH A PATTERN

Click For Crochet Abbreviations List

The pullover with an impeccable diamond pattern in combination with tight skirts looks feminine and elegant, and complete with jeans - quite sporty.

SIZES

36/38

YOU WILL NEED

Yarn (100% cashmere, 170 m / 25 g) - 200 g light gray; knitting needles No. 3; circular knitting needles No. 3.

PATTERNS AND

SCHEMES RUBBER

Rows in the forward and reverse direction (the number of loops is a multiple of 4 + 2 edge). 

Front rows: edge, * 1 front, 2 wrong, 1 front, from * constantly repeat, edge. 

Wrong rows: to knit loops according to drawing. 

Circular rows (the number of loops is a multiple of 4) = alternately 2 front, 2 wrong.


"Scythe" on 30 loops

Knit according to. Scheme 1. On it are given the front rows. In the wrong rows, knit the loops according to the pattern. Run 1–34 rows 1 time, then constantly repeat 3–34 rows. After the 1st row, 28 loops will remain on the knitting needles.

COCKET WITH PATTERN FROM "KOS" (IN THE BEGINNING OF 88 LOOP)

Knit according to. Scheme 2. On it are given the front rows. In the wrong rows, knit the loops according to the pattern. Start with the loops before the rapport, first do the rapport 1 time, during further knitting the coquette, repeat accordingly, end the loops after the rapport. Run 1 time the 99–166th rows, then according to repeat the pattern 135–166th rows 1 more time, while expanding the pattern according to scheme, then perform 1 time the 199-2448th rows. Pattern 3 expands from row 129, 
in each rapport in height of 32 rows on both sides according to scheme, and at the same time the number of loops in each rapport in height is reduced on both sides by 2 p., respectively.

Rhombus pattern pullover




UNDERLINED DECREASE

Left edge: 2 knit together front stitch , 2 front stitches, 1 wrong side, hem; 
right edge: hem, 1 wrong side, 2 front, 2 loops knit together front with an inclination to the left (remove 1 loop as the front, 1 front, then stretch it through the removed loop).

KNITTING DENSITY

36.5 p. X 41 p. = 10 x 10 cm; 
33 p. X 41 p. = 10 x 10 cm, connected by a yoke pattern.

PERFORMANCE OF THE WORK

BACK

Put 134 loops on the knitting needles and tie 2 cm with an elastic band for the strap. 

Continue the work as follows: edge, continue working with an elastic band on the next 51 loop, 30 p. With the “braid” pattern, continue working with an elastic band on the next 51 loop, edge. 

After the 1st row, as a result of the decreases in the “braid” pattern, 132 pins will remain on the knitting needles. 

After 24 cm = 98 rows from the initial row, knit the yoke on the middle 88 p. attention to decreases on both sides of the coquette pattern. 

After 42.5 cm = 174 rows from the plank, close 1 x 3 p. For armholes on both sides, then in the next 2 nd row 1 x 2 p. 

After 54 cm = 222 rows from the plank, all gum loops are used up. 

Then according to knit on the remaining 108 st. + on both sides, 1 edge pattern of the yoke. 

After 59 cm = 242 rows from the bar, close the middle 56 points for the neck and finish both sides separately. 

After 60.5 cm = 248 rows from the bar, close the remaining 27 p. Shoulders.




BEFORE

Knit like a back, but for the V-neck, after 42.5 cm = 174 rows from the bar (= simultaneously with the beginning of knitting the armhole), divide the work in the middle (in the middle of the work there are 4 wrong loops) and finish both sides separately, while the loops along the edge of the work separation will become edged. 

For the bevel of the neck along the inner edge, it is emphasized to reduce 28 x 1 p in each 2nd row. At the back height, close the remaining 27 p. Shoulders.

SLEEVE

Dial 74 loops on the knitting needles and tie 2 cm of elastic for the strap, while starting with 1 hem, * 1 wrong, 2 front, 1 wrong, from * constantly repeat, hem. 

Continue the work as follows: edge, continue working with an elastic band at the next 21 points, 30 points with a “braid” pattern, continue working with an elastic band at the next 21 points, edge. After the 1st row, 72 pins will remain on the knitting needles. 

At the same time, add for the bevel the sleeves on both sides in each 10th row from the plank 14 x 1 p. pattern = 100 p. 

After 39 cm = 160 rows from the plank, close for armholes on both sides 1 x 3 p., then in each 2nd row 23 x 1 p., 2 x 2 p. and 1 x 3 p. 

Through 52 cm = 214 rows from the plank to close the remaining 34 p.

ASSEMBLY

Perform shoulder seams. 

For the plank, dial 172 loops on circular knitting needles along the edge of the neck and knit with an elastic band. With a strap width of 2 cm, close all the loops according to the figure. 

Sew in sleeves, sew side seams and sleeve seams.




Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments