KNITTING BEIGE SWEATER WITH SHORT SLEEVES

Click For Crochet Abbreviations List

An easy-to-knit short-sleeved sweater can be worn in the office, for a walk or in a cafe. The model is knitted. Size 40-42 (44-46; 48-50; 52-54).  

beige sweater
Size  40-42 (44-46; 48-50; 52-54).

You will need:  300 (350; 350; 400) g of MERINO MIX yarn (60% merino wool, 40% acrylic; 50 g / 115 m) No. 8 in beige. Knitting needles No. 4.
                                                              
Patterns and types of loops
Izn. ch.

Knitting density
10x10 cm = 21 p. * 31 p.

Back: with a  thread in 2 addition dial 92 (100; 112; 120) p., Cut 1 thread, prod. work out. ch. single thread.
At a height of 30 cm, close from both old trees, in each 2nd p. 1 time 4 points, 2 times 2 points, 2 times 1 point (1 time 4 points, 2 times 2 points, 3 times 1 point; 1 time 4 points, 3 times 2 p., 3 times 1 p.; 1 time 4 p., 3 times 2 p., 4 times 1 p.) (= 72 (78; 86; 92) p.).

For the formation of shoulder bevels at a height of 47 (48; 49; 50) cm, close from both stops, in each 2nd p. 1 time 8 points, 1 time 7 points (1 time 9 points, 1 time 8 points; 1 time 10 points, 1 time 9 points; 1 time 11 points, 1 time 10 points).

Collar: the  remaining 42 (44; 48; 50) p. Elm. out. ch. to the height of the back 53.5 (55; 56; 57) cm and finish on the out. R. Track. R. (persons. old, work) to knit persons. n. Prod. work out. ch.
At the height of the backrest 59 (60; 61; 62) cm, close all items.

Before: with a  thread in 2 additions, dial 97 (105; 117; 125) items, cut 1 thread, cont. work out. ch. single thread.
At a height of 30 cm close on both sides. in every 2 r. 1 time 4 points .. 2 times 2 points, 2 times 1 point (1 time 4 points, 2 times 2 points, 3 times 1 point; 1 time 4 points, 3 times 2 points ., 3 times for 1 p .; 1 time for 4 p., 3 times for 2 p., 4 times for 1 p.) (= 77 (83; 91; 97) p.). 

To form shoulder bevels  at a height of 47 (48; 49; 50) cm, close on both sides. in every 2 r. 1 time 8 points, 1 time 7 points (1 time 9 points, 1 time 8 points; 1 time 10 points, 1 time 9 points; 1 time 11 points, 1 time 10 points).

Collar: the  remaining 47 (49; 53; 55) p. Elm. out. ch. to the front height of 53.5 (55; 56; 57) cm, finish out. R. Track. R. (persons. side work) to knit persons. n. Prod. work out. ch. At a height of 59 (60; 61; 62) cm, close all p.

Sleeve: with a thread in 2 addition, dial 63 (67; 71; 75) p., cut 1 thread, prod. work out. ch. single thread.
The beginning from the 3rd r. (= 1 cm) close on both sides in every 2 r. 2 times for 2 p., 11 times for 1 p., 4 times for 2 p. (2 times for 2 p., 12 times for 1 p., 4 times for 2 p.; 2 times for 2 p. 13 times for 1 p., 4 times for 2 p.; 2 times for 2 p., 14 times for 1 p., 4 times for 2 l.) (= 17 (19; 21; 23) p.).
At a height of 13 (14; 15; 16) cm, close the remaining p. 
Second sleeve elm. same. 

Assembly and processing
Run p. stitches out side front, in the center.
At a distance of 24 cm from the bottom edge (in the center) make 8 folds a trace. way:
to collect 5 points and sew (1st point from 5th point) to out. side before, as shown in the diagram.
On faces. side volume folds will turn out.

Run shoulder seams and collar seams.
Fold the collar along the river, knit people. n. and sew with out. side
Combine the center of the sleeve with the shoulder seam, sew in the sleeves.
Run the seams of the sleeves (first 2 p.).



Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments