DIAGONAL KNITTING SWEATER

Click For Crochet Abbreviations List

A light pink cardigan with an openwork pattern combined with an elastic band will appeal to everyone! Diagonal embossed stripes at the front appear due to increases in the middle and decreases on the sides.

Dimensions
36/38 (40 / 42-44 / 46-48 / 50)



You will need
Yarn (77% cotton, 15% cashmere wool, 8% polyamide; 175 m / 50 g) - 350 (400-450-500) g pink; knitting needles No. 4; circular knitting needles No. 7, length 40 cm.



Patterns and schemes

Openwork pattern with elastic
Knit according to the pattern. In width, start with a loop in front of the right arrow, repeat the repeat of 6 points between the arrows and finish 4 points after the left arrow. In height, repeat from the 1st to the 4th row. Make sure that the number of crochets and loops knitted together on the outer rapports in each row is the same.


Knitting density
20.5 p. X 36 p. = 10 x 10 cm, connected with an openwork pattern with an elastic band. The sample is made on knitting needles No. 4.




Completing of the work

Back
On knitting needles No. 4, double cross string 95 (101-107-119) sts. And knit 1 out. a number of purl.

Continue the work with an openwork pattern with an elastic band.

After 45 cm = 162 p. close from the typesetting row on both sides for armholes 1 time for 2 p., then in each 2nd p. 2 times for 2 p., 3 times for 1 p. And in each 4th p. 3 times, 1 p. = 71 (77-83-95) p. After 19.5 (21.5-23.5-25.5) cm = 70 (78-84-92) p. from the beginning of the armhole, close the middle 45 points for the neck and first finish the left side.

To round the cutout, close from the inner edge in each 2 r. 1 time 2 p. And 1 time 1 p.

After 1.5 cm = 6 p. from the beginning of the cut, close the remaining 10 (13-16-22) p. Finish the

other side symmetrically.



Before
On knitting needles No. 4 with a double thread, dial 59 (64-67-71) sts. And knit 1 out. a number of purl.

Continue the work with an openwork pattern with elastic, while in order to give the part the desired shape, perform shortened rows. To do this, knit first only on 5 middle loops, at the same time on both sides, lay the rest of the loops. Mark the middle 3 points with a marker and knit the last 3 points of the pattern repeat on these loops.

Now, in each front row on both sides of the marked 3 middle loops, knit 1 point from the broach according to the pattern (these loops are gradually included in the openwork pattern) and simultaneously include 1 of the delayed loops on both sides at the end of each shortened row.

Continue to knit in this rhythm until all the loops are involved in the work, including the newly dialed = 113 (121-129-137) p. After 54 (58-62-66) p. At the same time, on both sides gradually add added loops to the openwork pattern with elastic.

Then continue to increase in the middle of the part, at the same time in each front row, tie the edge with the next and previous loops together with the front, as a result the number of loops remains unchanged.

After 45 cm (measured on the side) from the lower corner, close on both sides for the armhole 1 time for 4 p., Then in each 2nd p. 1 time for 4 p., 2 times for 3 p. And 2 times for 2 p. = 77 (85-89-101) p.

At the same time, continue to decrease from both sides.

After 17 (19-21-23) cm (measured along the midline) from the beginning of the armhole, close the middle 23 points for the neck and first finish the left side.

To round the cutout, close from the inner edge in each 2 r. 1 time 3 (4-5-3) p., 1 time 2 p. And 12 times 1 p.

At the same time, continue to decrease from the outer edge.

In the next row, close the remaining 10 (13-16-22) p. Finish the

other side symmetrically.



Sleeves
On knitting needles No. 4, dial 53 (59-59-65) sts with a double thread and knit 1 out. a number of purl.

Continue the work with an openwork pattern with an elastic band.

For bevels, add on both sides 6 times in each 16th p. and 3 times in each 14th p. (2 times in each 16th p. And 8 times in each 14th p. - 3 times in each 12th p. And 12 times in every 10th p. - 1 time in every 12th p. and 15 times in each 10th p.) 1 p. = 71 (79-89-97) p. The added loops should be included in the openwork pattern with elastic.

With a sleeve height of 42 (44-46-48) cm = 152 (158-166-172) s. close on both sides for okat 1 time for 2 p., then in each 2 r. 2 times for 2 p. And 3 times for 1 p., In each 4th p. 11 times 1 p., Then again in every 2 r. 3 times 1 p. And 3 times 2 p. = 13 (21-31-39) p.

After 19 cm = 68 p. from the beginning of okat formation, close the remaining 13 (21-31-39) p.



Assembly
Perform shoulder seams.

On circular knitting needles, dial 136 p. Along the edge of the neck and in the next circular row, close them with double thread on knitting needles No. 7, for this, knit 2 pitches together on the wrong side and immediately close.

Sew on sleeves, complete sleeve seams and side seams.




Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments