SLEEVE PULLOVER

Click For Crochet Abbreviations List

Dimensions: 38/40 (44/46). You will need: 600 (650) g ​​of Soft Linen Mix yarn from SCHACHENMAYR camellia color (Fb 00037) (70% viscose, 30% linen, 93 m / 50 g), straight knitting needles No. 3,5 and 4, and circular knitting needles number 3,5. Facial surface: faces. ranks - persons. hinges, out. ranks - out. loops. Openwork strip for 32 p.: Knit according to the pattern on which the persons are shown. ranks. In out. the rows of loops are knitted according to the pattern, the crochets are purl. Repeat from 1st to 12th row. Special decrease 2 p.: From the right edge after chrome. p. knit 3 p. together persons

From the left: knit to the last 3 p., Then 3 p. Together of persons. broach (= remove 1 p. as faces., 2 p. together faces. and stretch the loop through the shot), chrome. 

Knitting density: 

persons. smooth surface: 23 p. and 29 p. = 10 x 10 cm; 

openwork strip .: 32 p. = 13 cm and 26 p. = 10 cm. 

Note: 

Due to the different density of knitting in the openwork strip on the hem below, a curved edge will be obtained. 

The height data in the following text always refers to the area of ​​faces. iron, unless otherwise indicated. 

Back: 

On knitting needles No. 3,5, dial 114 (126) p. And for the strap, knit 1 cm = 1 row with the front and 2 rows with the purl stitches.

Then continue on knitting needles No. 4 to the next. distribution: chrome. p. 40 (46) p.p. smooth surface, 32 p. openwork strip, 40 (46) p. persons. smooth, chrome. n. 

For raglan bevels through 33 cm = 96 p. from the bar on both sides close 1 x 5 p., then * 3 x in each 4th p., then 1 x in the next. 2 r. close 2 p., repeat from * 1 more time, then 9 (12) x in each 2 r. reduce by 2 p. a special decrease. 

After 49.5 cm = 144 p. (51.5 cm = 150 p.) From the bar (measured in the strip of the inner surface) or after 55.5 cm = 144 p. (57.5 cm = 150 p.) From the plank (measured in the area of ​​the openwork strip) close the remaining 36 p. 

Before: knit in the same way. 

Elongated sleeves: 

On knitting needles No. 3,5 dial 60 (64) p. And tie the bar, as on the back.

Then continue on knitting needles No. 4 to the next. distribution: chrome. p. 13 (15) p.p. smooth surface, 32 p. openwork strip, 13 (15) p. persons. smooth, chrome. n. 

At the same time, for the bevels of the sleeve from the bar on both sides, 11 x in each 10 m r. (15 x alternately in each 6th and 8th p.) Add 1 p. Of persons. smooth surface = 82 (94) p. 

For raglan bevel through 45.5 cm = 132 p. (43.5 cm = 126 p.) From the bar on both sides close 1 x 5 p., Then decrease 9 x in each 6th p. 2 p. by special decrease (2 x in each 6th p. and 1 x in the next 4 r. p. 2 p. by special decrease, repeat from * 3 more times). 

After 66 cm = 192 p. from the bar (measured in the strip of the inner surface) or through 74 cm = 192 p. from the plank (measured in the area of ​​the openwork strip) close the remaining 36 p. 

Assembly: 

Perform raglan seams.

For the strap on the neckline on circular knitting needles, raise 104 p. And knit 2 circle. R. out. loops. 

Then close all the loops on the wrong side. 

Sew side seams and bottom seams of the sleeves.






Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments