SWEATER WITH VOLUME PLEATS STYLISH AND NOBLE

Click For Crochet Abbreviations List

This raglan sweater, knitted from top to bottom, looks noble and stylish thanks to pure cotton yarn and voluminous wide folds at the bottom of the model.

DIMENSIONS
36/38 (40 / 42-44 / 46-48) 
 

 
YOU WILL NEED
Yarn (100% silk; 150 m / 50 g) - 400 (450-500-550) g ​​beige; circular knitting needles No. 3 
50 cm long; circular knitting needles No. 4, length 40 and 60 cm; circular knitting needles No. 5, length 40 and 60 cm; stocking knitting needles No. 4; hook number 3.
 

PATTERNS AND SCHEMES
 

RUBBER
Knit alternately 1 person., 1 out.
 

FACE FACE
Front rows - front loops, wrong rows - wrong loops. In circular rows, knit all the loops face.
 

WRITTEN IRON
Front rows - purl loops, wrong rows - front loops. In circular rows, knit all the loops wrong.
 

DECORATIVE ADDITIVES
From the right edge = chrome., 1 person from the broach. crossed. 

From the left edge = from the broach knit 1 person. crossed, chrome.
 

DECORATIVE REDUCES
From the right edge = chrome., 2 p. Knit together the front with a slope to the left (= 1 p. Remove, as with face knitting, knit the next loop with the front, then stretch it through the removed loop). From the left edge = 2 p. Knit together the front, chrome.


 

KNITTING DENSITY
22.5 p. X 29 p. = 10 x 10 cm, connected by the front surface. The sample is made on knitting needles No. 4.
 

ATTENTION
Edge knit like “edge chain.”
 

PATTERN




COMPLETING OF THE WORK
 

BACK
Knit from top to bottom.

On the knitting needles No. 4, with the help of a hook, perform a temporary set of 42 p. 

For ragged bevels, decoratively add on both sides in each 2nd p. 31 (36-40-45) times for 1 p. = 104 (114-122-132) p. 

After 21.5 (25-27.5-31) cm = 62 (72-80-90) p. additionally dial from both sides 1 time each time 7 p. = 118 (128-136-146) p. 

After 14 (12.5-12-10.5) cm = 40 (36-34-30) p. from the end of ragged bevels, mark with markers for knitted folds 29 (32-34-37th) st., 68 (73-77-82th) st. and 107 (114-120-127th) st. These 3 st constantly knit with the wrong side of the stitch, continue to knit the remaining loops with the front stitch, while knitting 16 times in every 2 r. on both sides of each of 3 p. with a marker from a broach of 1 person. crossed = 6 increments per row with increments = 214 (224-232-242) p. 

After 17.5 cm = 50 p. from the beginning of the folds tie 1 person. a row as follows: knit the edge and the next loop together with the front, 10 (13-15-18) persons., 1 fold (= 16 st. knitting and knitting this knitting needle behind the 1st stocking knitting needle (the loops lie on the wrong side), then knit the first 2 loops on both the knitting needles and the first stitch from the working (left) knitting needle together, but knit the middle knitting needle for the first time at the same time the first 2 p. together facial), * 22 (24-26-28) persons., 1 fold, from * repeat 2 times, 9 (12-14-17) persons., knit the last loop with the hem e front = 115 (125-133-143) p. 

Then close the stitches on knitting needles No. 5 with a double thread as follows: * 2 p. Knit together with the wrong side and close, knit 2 times for 1 p. Purl and close, from * repeat.
 

BEFORE
Knit like a back.
 

SLEEVE
Knit from top to bottom: on knitting needles No. 4 with a hook, perform a temporary set of 6 p. And knit with the front stitch. 

For ragged bevels, decoratively add on both sides in each 2nd p. 31 (36-40-45) times for 1 p. = 68 (78-86-96) p. 

After 21.5 (25-27.5-31) cm = 62 (72-80-90) p. from the typesetting row, additionally dial on both sides 1 time for 7 p. = 82 (92-100-110) p. 

For bevels, decoratively reduce on both sides 6 times in each 16th p. (8 times in each 12th p. - 3 times in every 8th p. And 7 times in every 10th p. - 5 times in every 6th p. And 8 times in every 8th p. ) 1 p. = 70 (76-80-84) p. 

After 39 (37.5-37-35.5) cm = 114 (108-108-102) p. from the end of ragged bevels, tie another 8 cm = 27 p. on knitting needles No. 3. rubber band, while in the 1st r. evenly decrease 9 p. = 61 (67-71-75) p. 

Then sew the stitches.
 

ASSEMBLY
Crochet folds at the front 1 p. conn. Art. 

Make ragged seams, while grabbing only one half of the hem loop into the seam. 

Dissolve the temporary set and close all loops on knitting needles No. 5 with a double thread as follows: * 2 p. Knit together from the wrong side and close, 2 times knit 1 p. and close, from * repeat. 

Finally, complete the seams of the sleeves and the side seams.

 




Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments