JUMPER EVENING OUTING

Click For Crochet Abbreviations List

Jumper with a wide neck and pockets. For cold summers and warm autumn.

Size (s): S - M - L - XL - XXL - XXXL

You will need: 450-500-550-600-700-750 gr. DROPS AIR yarn (70% alpaca, 23% polyamide, 7% wool, 50 g ≈ 150 m. Yarn group C) No. 03 pearl gray, circular knitting needles (80cm) No. 5 and No. 4,5 for elastic.
Knitting density: 17 p. X 22 p. persons. stitching with needles No. 5 = 10x10 cm.
18 p. x 23 p. persons. stitching with needles No. 4,5 = 10х10 cm.
 
 
Shawl / Rib (straight rows) : Knit all rows face. 1 hem = 2 rows.
Additions : add 1 p. Using 1 yarn, next knit a series of crochets crossed, avoiding the formation of holes.
—————————————————————
The jumper is knitted in a circle on circular knitting needles from the bottom up. The canvas is separated after the formation of the armholes and before the back are tied separately. Sleeves are knitted in straight rows. At the end, the neck and pockets are tied.
Body
Type 176-192-208-224-240-264 p. On knitting needles number 4.5 and tie 1 row of people. Next, tie 4 cm with a 2L / 2I elastic band. Go to the knitting needles No. 5 and tie 1 row of faces., Evenly decreasing 12-16-16-16-12-16 p. = 164-176-192-208-228-248 p. Mark with markers the beginning of the row and after the first 82- 88-96-104-114-124 p. (= Sweater sides). Next knit faces. smoothness, observing the density of knitting.
At a height of 50-52-54-56-58-59 cm, close 2-2-4-4-4-4-4 p. On the sides for armholes (i.e. 1-1-2-2-2-2- 2 p. On both sides of each marker). Front and backrest finish separately.
 
Back
= 80-86-92-100-110-120 p. Continue to close the p. On both sides to form an armhole: 2 p. 0-0-1-2-3-4 times and 1 p. 0-0- 0-0-1-3 times = 80-86-88-92-96-98 p.
At an altitude of 65-68-71-74-77-79 cm, close the item of the throat together with the raglan decreases. way: Neck : close the middle 30-30-32-32-34-36 p. and finish each shoulder separately. Next close row 1 p. from the neck. Regled oblique : to close on each side of the part in every 2nd row: 4 times for 6-6-6-7-7-7 p. And 1 time for 0-3-3-1-2-2 p. (= only 24-27-27-29-30-30 p. closes on each side, forming a diagonal armhole)

Before
= 80-86-92-100-110-120 p. Form armholes in the same way as on the back = 80-86-88-92-96-98 p. At a height of 55-58-61-64-67-69 cm . close the middle 26-26-28-28-30-32 p. for the neck and finish each shoulder separately. Continue to close the trail for the neck. Scarf: 1 time for 2 p. and 1 time for 1 p. = 24-27-27-29-30-30 p. on each shoulder.
At a height of 65-68-71-74-77-79 cm, close on both sides for diagonal armholes as described for the back.
Sleeve
Knit in straight rows on circular knitting needles.
Dial 38-38-42-42-46-46 p. (Including 1 chrome. P. On both sides) on knitting needles No. 4.5. Knit 1 row out. with IP, then knit with an elastic band 2L / 2I, knitting 1 chrome. plat.binding on each side. After 4 cm. Gum go to the knitting needles No. 5 and faces. smooth surface, while in the 1st row evenly reduce 4 p. = 34-34-38-38-42-42 p.
At a height of 7-7-6-6-6-7-7 cm, add 1 p. from two of the parties - see tip on increase above. Repeat the increase every 5½-4-4-3-2½½-2 cm. A total of 6-8-8-10-11-12 times = 46-50-54-58-64-66 p.
At a height of 37- 37-36-35-34-32 cm. Start the formation of the sleeve ridge, closing the item at the beginning of each row trace. way: 1 time for 3 p., 4-4-3-5-6-8 times for 2 p., then 3 p. to the length of the sleeve 42 cm. Close all p. and tie the second sleeve.
Assembly
Perform shoulder seams. Sew sleeves to the main part and complete the inner seams of the sleeves.
Neckline
Dial approx. 92-104 p. Along the neckline on circular knitting needles No. 4.5. Tie 1 row of persons., Bringing the number of stitches to 92-92-96-100-100-104 st. Stitch 4 cm with 2L / 2I elastic band and close all stitches in the picture.
Pocket
Knit in straight rows.
Dial 32-32-34-34-36-36 p. (Including 1 chrome. P. On both sides) on knitting needles No. 5 and tie 1 row of faces. with IP. Next knit faces. smooth surface to a height of 18-18-18-20-20-20-20 cm. Tie 2 scar boards. viscous and close all p.
Tie another 1 pocket and sew them to the front immediately after the gum, leaving a distance of approx. 16-16-18-18-20-20-20 cm.
Diagram







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments